LMX2571EVM

LMX2571EVM图片1
LMX2571EVM图片2
LMX2571EVM图片3
LMX2571EVM图片4
LMX2571EVM概述

TEXAS INSTRUMENTS  LMX2571EVM  评估电路板, 频率合成器

The is an evaluation board for the LMX2571 low-power, high performance PLLatinum RF synthesizer with FSK modulation. The LMX2571 is a frequency synthesizer with low noise, high performance integrated VCO. The VCO core is a low noise 5GHz VCO, after the output channel divider, the divided down frequencies are 10MHz to 1400MHz. The internal VCO is bypassable allowing the use of external VCO. A separated 5V charge pump is dedicated for external VCO, eliminating the need for an op-amp to support 5V VCO. Output of the external VCO can also route through another output channel divider. The LMX2571EVM can be programmed via SPI programming, I2S programming and PIN mode. PIN mode supports up to 8-level FSK modulation. The board can be powered with a 5V external supply.

.
External VCO option
.
Direct digital FSK modulation
.
One TX/RX output or two fan-out outputs
.
Crystal, XO or differential reference clock input
LMX2571EVM中文资料参数规格
技术参数

频率 10MHz ~ 1.4GHz

其他

产品生命周期 Active

包装方式 Bulk

制造应用 信号处理

符合标准

RoHS标准 RoHS Compliant

含铅标准 Lead Free

REACH SVHC版本 2015/06/15

数据手册

在线购买LMX2571EVM
型号: LMX2571EVM
制造商: TI 德州仪器
描述:TEXAS INSTRUMENTS  LMX2571EVM  评估电路板, 频率合成器

 锐单商城 - 一站式电子元器件采购平台  

 深圳锐单电子有限公司