TPS54372EVM-215

TPS54372EVM-215图片1
TPS54372EVM-215图片2
TPS54372EVM-215图片3
TPS54372EVM-215图片4
TPS54372EVM-215概述

3V~6V,输出可调低到外部基准电压的降压变换评估

The kit allows the designer to easily evaluate the TPS54372 synchronous buck DC/DC converter with integrated 3 A continuous power MOSFETs. The input range is 3-6 V and the output voltage is adjustable down to the external reference voltage applied to the VREF pin. The module provides an output voltage VTTQ that is one half the voltage VDDQ from a nominal 3.3 V or 5 V input.

The TPS54372 is ideal for active bus termination applications such as SSTL, GTL, and DDR memory.

Please see the TPS54372EVM-215 User"s Guide SLUU119 document for more information.

TPS54372EVM-215中文资料参数规格
技术参数

输出接口数 1

输出电压 1.25 V

输出电流 3 A

开关频率 700 kHz

输入电压 3V ~ 6V

其他

产品生命周期 Unknown

符合标准

RoHS标准 Non-Compliant

含铅标准 Lead Free

数据手册

在线购买TPS54372EVM-215
型号: TPS54372EVM-215
制造商: TI 德州仪器
描述:3V~6V,输出可调低到外部基准电压的降压变换评估

 锐单商城 - 一站式电子元器件采购平台  

 深圳锐单电子有限公司