TPS61050EVM-269

TPS61050EVM-269图片1
TPS61050EVM-269图片2
TPS61050EVM-269图片3
TPS61050EVM-269图片4
TPS61050EVM-269图片5
TPS61050EVM-269图片6
TPS61050EVM-269概述

电源管理IC开发工具 TPS61050EVM-269

The facilitates evaluation of the TPS61050 1.2 A High Power White LED Driver IC in the BGA YZG package.

The TPS6105x device is based on a high-frequency synchronous-boost topology with constant current sink to drive single white LEDs. The device uses an inductive fixed-frequency PWM control scheme using small external components, minimizing input ripple current.

The 2 MHz switching frequency allows the use of small and low profile 2.2 μH inductors. To optimize overall efficiency, the device operates with only a 250 mV LED feedback voltage.

TPS61050EVM-269中文资料参数规格
技术参数

输出电压 5.5 V

输入电压 2.5V ~ 6V

其他

产品生命周期 Unknown

包装方式 Bulk

符合标准

RoHS标准 Non-Compliant

含铅标准 Lead Free

数据手册

在线购买TPS61050EVM-269
型号: TPS61050EVM-269
制造商: TI 德州仪器
描述:电源管理IC开发工具 TPS61050EVM-269

 锐单商城 - 一站式电子元器件采购平台  

 深圳锐单电子有限公司