HTSW-116-15-G-S

HTSW-116-15-G-S图片1
HTSW-116-15-G-S图片2
HTSW-116-15-G-S概述

SAMTEC HTSW-116-15G-S Board-To-Board Connector, 2.54mm, 16Contacts, Header, HTSW Series, Through Hole, 1Rows

The HTSW series from are high temperature terminal strip headers. These are unshrouded through hole headers with 0.025" 0.635mm square post and mates with Samtec SSW, SSQ, SSM, ESW, ESQ, BCS, BSW, CES, SLW, IDSD, IDSS, SMSD and SMSS series of connectors. HTSW series connectors are available with industry"s largest variety of standard pin counts, terminal lengths and are used where signal integrity and reliability is of major concern.

.
Orderable with single/dual/triple rows -S/-D/-T/-Q option
.
Pitch spacing is 2.54mm 1 to 50 contacts per row with straight orientation
.
High operating temperature range of -55°C to 125°C for 10µ" gold plated contacts
.
Terminal material is phosphor bronze
.
Natural liquid crystal polymer insulator material
.
Complies with UL E111594 and CSA 090871_0_000 standards
.
Locking lead and locking clip feature is optional
HTSW-116-15-G-S中文资料参数规格
技术参数

触点数 16

极性 Male

触点电镀 Gold

排数 1

封装参数

安装方式 Through Hole

引脚间距 2.54 mm

外形尺寸

引脚间距 2.54 mm

物理参数

外壳颜色 Natural

触点材质 Phosphor Bronze

工作温度 -55℃ ~ 125℃

符合标准

RoHS标准 RoHS Compliant

REACH SVHC标准 No SVHC

REACH SVHC版本 2015/06/15

数据手册

HTSW-116-15-G-S引脚图与封装图
HTSW-116-15-G-S引脚图
HTSW-116-15-G-S封装图
HTSW-116-15-G-S封装焊盘图
在线购买HTSW-116-15-G-S
型号: HTSW-116-15-G-S
制造商: Samtec 申泰电子
描述:SAMTEC HTSW-116-15G-S Board-To-Board Connector, 2.54mm, 16Contacts, Header, HTSW Series, Through Hole, 1Rows

 锐单商城 - 一站式电子元器件采购平台  

 深圳锐单电子有限公司